Amar Infrabuild | Construction Plants & Machinery

Plants Machinery

Name of Equipment No. of Units Make Capacity
R.M.C Plant 2 Nos.
  • 1) Apollo
  • 2) Schwing Stetter
  • 45 Cu. m
  • 60 Cu. m
Transit Mixers 11 Nos.
  • Schwing Stetter
  • 6 Cu. m
Concrete Pump 2 Nos.
  • Putzmeister
  • Sany
  • 40 Cu. m/hr
  • 60 Cu. m/hr
Automatic Hotmix Asphalt Plant 3 Nos.
  • UDM 3050/Unitor
  • Condequip
  • Alka Earth Tech Equip.
  • 40-60 MT/Hour
  • 40-60 MT/Hour
  • 60-90 MT/Hour
Electronic Sensor Paver Finisher 1 No.
  • Unipave
  • 180 MT/Hour
Electronic Sensor Paver Finisher 1 No.
  • S.H.D. 450 Solid Steel
  • 170 MT/Hour
Vibratory Roller 1 No.
  • T-800 Surelia
  • 38 MT
Paver Finisher 3 Nos.
  • 2 Nos. Morris
  • 1 No. Apollo
  • 80-100 TPH
JCB Excavators 3 Nos.
  • 30/Escorts
  • 60 HP
Tippers/Dumpers 6 Nos.
  • TATA
  • 5.5 Cu. m
Static Rollers 6 Nos.
  • B.M. & Assembled
  • 8-10 Tons
Water Tankers 1 No.
  • TATA
  • 5000 Liters
Bitumen Storage Tank at Plant 2 Nos.
  • Assembled
  • 1.5 M.T.
Concrete Mixture 4 Nos
  • Condequip
  • 400 Liters
Mastic Cooker 2 Nos.
  • Assembled
  • 1.5 Ton
Concrete Vibrators 6 Nos.
  • Harsha Machi
  • 6mm & 80mm
Generator Set 1 No.
  • Kirloskar
  • 125 Kv
Material Testing Laboratory alongwith all Testing Apparatus for Asphalt and Concrete works 1 No.
  • Kirloskar
  • 125 Kv